01Projects

Real Alaska Infrastructure. Real Numbers.

A selection of projects from the North Slope to Kachemak Bay. Every entry includes quantities, logistics, and the products that made it happen.

Statewide Project Map
North Slope Pad Expansion
Oil & Gas
Prudhoe Bay, AK · 2024

North Slope Pad Expansion

Remote batch plant supporting drill pad expansion in sub-zero conditions.

Quantity
12,400 yd³
Timeline
Q1 2024
Challenge
Remote site with no road access in winter; required full plant mobilization via ice road.
Logistics
Ice road haul of plant, aggregate stockpile staged previous summer, on-site camp crew.
Products
Cold-weather ready mixHeated water systemAir-entrained mix
Sterling Highway Bridge Replacement
DOT
Soldotna, AK · 2023

Sterling Highway Bridge Replacement

Precast deck panels and structural concrete for state highway bridge.

Quantity
3,200 yd³ + 48 precast panels
Timeline
May – Sept 2023
Challenge
Tight closure windows required precast solution with night pours for cast-in-place sections.
Logistics
Precast manufactured locally, night-pour ready mix scheduled around traffic control.
Products
Precast deck panels8,000 psi structural mixDOT-spec barriers
Cooper Landing Bypass & Juneau Creek Bridge
DOT
Cooper Landing, AK · 2024

Cooper Landing Bypass & Juneau Creek Bridge

Structural ready mix concrete supply for the Juneau Creek Bridge, the highest single-span bridge in Alaska, as part of the massive Cooper Landing Bypass highway realignment.

Quantity
8,500 yd³ of structural concrete
Timeline
2023 – 2024
Challenge
Complex structural columns, massive pours at extreme heights, strict DOT thermal concrete specifications, and heavy winter weatherization requirements.
Logistics
Continuous concrete dispatch under tight scheduling, on-site temperature monitoring and thermal control, boom pump setups at major heights, and winter heating systems.
Products
6,500 psi structural bridge mixMass concrete with thermal specificationsDOT barriers & precast panels
Anchorage Distribution Warehouse
Commercial
Anchorage, AK · 2024

Anchorage Distribution Warehouse

180,000 sq ft tilt-up warehouse with integrated dock walls.

Quantity
9,800 yd³
Timeline
Spring – Fall 2024
Challenge
Aggressive schedule required 600+ yd³ pour days with QC documentation.
Logistics
Multi-truck convoys from Kenai, on-site pump coordination, weekend overtime.
Products
Tilt-up panel mixSlab mix with fiberLoading dock precast
Kachemak Bay Marine Bulkhead
Marine
Homer, AK · 2022

Kachemak Bay Marine Bulkhead

Articulated concrete block bulkhead for tidal erosion protection.

Quantity
1,800 lf bulkhead
Timeline
Summer 2022
Challenge
Tide-window installation with permitted in-water work periods.
Logistics
Barge delivery of block, low-tide install windows.
Products
Articulated block matFilter fabric package
Kenai Bluff Stabilization
Infrastructure
Kenai, AK · 2023

Kenai Bluff Stabilization

Large-block engineered retaining wall preventing bluff loss.

Quantity
22 ft tall × 420 ft long
Timeline
Summer 2023
Challenge
Active erosion site requiring rapid mobilization and engineered geogrid design.
Logistics
Local block production, engineered design, drainage system.
Products
Anchorwall large blockGeogridChimney drainage
Valdez Tank Foundation
Oil & Gas
Valdez, AK · 2024

Valdez Tank Foundation

Heavy structural pour for above-ground tank foundation.

Quantity
4,400 yd³ continuous
Timeline
Summer 2024
Challenge
Continuous mat pour requiring 36-hour scheduling and QC.
Logistics
Multi-supplier coordination, on-site lab, sequenced trucking.
Products
6,000 psi mat-pour mixMass concrete thermal control

Have a project that needs this kind of execution?

Start a Quote
Call Dispatch